
Beginning of demolition |

Demolition of Auditorium Entrance |

Demolition - General view |

Demolition of Office Building 08/08/02 |

Demolition of Office Building 08/08/02 |

Demolition of Office Building 08/08/02 |

Demolition of Office Building 08/08/02 |

Demolition of Office Building 08/08/02 |

Demolition of Auditorium 08/13/02 |

Demolition of Auditorium 08/13/02 |

Demolition of Auditorium 08/13/02 |

Demolition of Auditorium 08/13/02 |

Demolition of Auditorium 08/13/02 |

Demolition of Auditorium 08/13/02 |

Excavation
09/02/02 |

Excavation
09/02/02 |

Excavation
09/02/02 |

Excavation 09/02/02 |

Current Site for new buildings 09/28/02 |

Current Site of new buildings 09/28/02 |

Preparing to pour the footings |

Forms and reinforcing rods for footings |

Reinforcing rods for foundation |

Forms for foundation pouring |

Final preparations for pouring first foundation
section |

Preparing to lay the new storm drain pipe |

Storm drain catch basins prior to installation |

Connecting storm drain pipes |

Laying the paving stones for new entry walk to the Church |
 |
 |
 |

|

|

12/13/02 Breaking out the last of the rock strata |

12/16/02 Preparing to pour the footing to complete
the enclosure |

The foundation 75% complete (12/20/02) |

Erecting the final foundation forms (12/23/02) |

Pouring the final section of the foundation (early
January '03) |

The foundation complete (01/10/03) |

The job site as it looked for most of the winter |

April 22: Steel begins to be delivered |

April 22: Steel being lifted into place |

April 22: Steel erected on first day of delivery |

April 23: Second day of steel delivery |

May 12, 2003: Installing light gage steel |

June 16: Completing structural steel installation |

June 17: Steel sub flooring for first floor (looking
west) |

June 22: Steel & floor joists (from Tower) |

Steel Frame |

Concrete slab for first floor |

Steel frame from California Street |

July 14: Installing roof supports |

July 16: Light steel being installed |

July 17: More light steel; window well concrete being poured |

August 06: 2nd floor sub floor installed |

August 06: From outside the Saunders Room, looking west |

August 16: View from the Tower |

August 16: Looking into the Children's chapel (first floor) from outside the Saunders Room, looking west |

August 16: The view from the parking lot |

Late August: the roof is installed
|

August 26: North façade from the entry to the parking lot
|

August 31: From the Saunders Room steps looking across the courtyard to the north |

August 31: From the Saunders Room steps looking west through the space that will become the Chapel on the first floor. |

September 4: Exterior sheathing board applied |

September 6: Frames for arched windows on west face |

September 6: Looking down the driveway towards Fairmount Road. |

September 9: Early signs of the stone arch entry
(looking south) |

September 16: The west side seen from the Rectory third floor. |

September 20: Installing windows on west wall |

September 20: Inside the Great Room |

October 2: The north wall (from California
Street) |

October 23:
The entry corridor, looking from the parking lot door
towards the Church. |

October 23: The entry corridor, looking from the Church
towards the parking lot.
|

October 23: Just inside from the Church, looking west:
putting up the sheetrock.
|

October 23: Looking up in the entry atrium.
|

October 23: The Great Room, looking south (away from the
parking lot, towards the courtyard.)
|

October 23: The back stairway, standing in the Great Room
looking east.
|

October 29: The entry arch, forms removed, prior to
installation of facing stone.
|

October 29: Laying the stone work around the
foundation, west wall near courtyard.
|

November 18: Installing the main doors from the parking
lot |

November 21:
Applying the base coat for the stucco |

November 26: Early stone work at the parking lot entry |

December
16: The landing of the main stairway to the second floor
at the entry (prior to final painting!) |

December 16, 2003: Light gage steel in the corridor
leading into the Church |

December 16: Arch frame close up |

December 16: Second floor corridor framing |

December 21:
Arched entry from the parking lot |

March 3, 2004: Measuring for speakers in the Chapel |

March 3:
The west wall of the Great Room |

March 29:
Buttresses being built on west wall |

March 30:
The north wall from parking lot entrance |

March
30: Looking in to the Parish office |

April 8: From
the entry, down the corridor, towards the Church |

April 8,
2004: Looking into the Chapel |

August 17, 2004:
View of outer arch
|

August 26, 2004 |

August 26, 2004 |

August 26, 2004 |

August 26, 2004
|